Electrical

The all new wiring in 2014 was installed in a couple of weeks. Brian created an electrical box consisting of circuit breakers, postive and negative busses, terminal strips, inverter, and solar charge controller.

We have now moved the electrical panel to the new navigation station, where the old ice box was!

Interior Paint

We painted interlux epoxy primekote on the interior cabin. We like the matte finish and high build easy application. Its also a hard durable finish that works inside (less vulnerable to sunlight), so we avoid the high-gloss, expensive, difficult to apply top coat perfection that we use outside.

We’ll be updating with more paint in the future, and this is a great base for almost anything we choose.

Head – Chart Room

The head was initially converted to a chart room in 2013. All the thru hulls were covered, a composting toilet was installed, and then moved to the V-berth.

We have now re-installed the head in this area, and moved the charting/navigation area to the location of the old icebox.