Video: Cubic Mini Cub Wood Stove

We are loving springtime in Uruguay, and we’ve made the time to reflect back on winter in Uruguay with our new Cubic Mini Cub wood stove. We hope you enjoy the video!

Thank you Chuck for bringing us the wood stove, and for all the tips on birding!

Integral Water Tank: Summary and Repair

We repaired our integral water tank a few months ago, here in Uruguay. This video is a recap of the build project from two years ago, and details of the recent repair. Overall, the integral water tank has been a vast improvement. It is easy to clean and fill. We are happy to make use of the space below our cabin sole that was filled with foam. The 65 gallon water tank makes long term cruising much easier.

 

Cockpit Lockers

After removing the engine, we were left with a huge open space under the cockpit. No longer needing to access machinery, we are able partition the space into lockers for added structure and watertight integrity. Continue reading Cockpit Lockers

Cockpit Footwell

Seawinds were designed with large cockpit footwells. If confronted with a survival storm, we plan to lay to a series drogue, exposing our stern to breaking waves. This makes a strong, small volume cockpit essential.  Continue reading Cockpit Footwell

Bucket sink galley

The bucket sink is versatile and moveable. In Dawn Treader, the first location was below the companionway.

After altering our companionway and building a new water tank, we got to work on the galley. We created 3 storage sections (where there was one) with watertight bulkheads.

Our simple galley design has made its everyday use clean, easy, and fun.

Watertight Companionway

Traditional sliding companionway designs seem to be the standard, few other options are available. However, we were not satisfied with Dawn Treader’s original design. While researching watertight designs and oceangoing rowboats, we found interesting hatch options that looked to be compatible. We chose the Lewmar Ocean 70 hatch for its large entryway, strength, and watertightness.

A few things changed simultaneously with the new companionway; look for new posts coming soon! Our cockpit footwell volume was reduced. Cabin ventilation was enhanced with the addition of a Lewmar Ocean 30 below the nesting dinghy. Inside the cabin, we now have more space! Our galley area has more elbow room, the new navigation station is in progress, and the cabin design is more open. The cabin sole also has 2 more usable feet of space (we are installing new sole as a result of the water tank project), and now there is ample room for a yoga mat!

We are happy with the companionway redesign! Exit and entry are easier than before, and we are excited to test our watertight hatch at sea! With this big project done, we are one large step closer to sailing.

Building an Integral Water Tank

Our original project plans did not address changing our water tank. But, upon removing the engine, we gained better access and visibility to the water tank area, this revealed the need for further investigation…

Our work continued, and we ended up removing everything from the bilge: water tank, resin blocks, foam (so much foam). We discovered lots of usable storage after removing oily residue, cleaning, and drying out the bilge.

Removing the water tank revealed the need for reinforcing the compression post, read more in our related post (Repairing Compression Post Base).

Next, we need to construct a new tank! Our new tank will have an expanded footprint that extends well forward of the previous tank. Also, a new integral tank is a good choice for maximizing our water storage capacity. We hope to double the capacity of the previous tank (from 30 gallons).

This unexpected project has lots of benefits! We will be able to carry lots more water for long voyages, our hull has been reinforced with 6 new floors and a heavy fiberglass layup, and we now know Dawn Treader is clean from top to bottom! No more hidden treasures!

In part two we complete the tank with paint, install the tank top/sole, add plumbing and inspection ports.

V-Berth

The original V-Berth left something to be desired: storage, comfort, style, etc. Some of the original cabinetry had been cut away to accommodate an obsolete holding tank, and the volume of available space was largely inaccessible with the previous compartment design. V-berth reconstruction was also a great opportunity to add structure and strengthen the forward third of the Dawn Treader. Its watertight integrity has been enhanced with new watertight compartments. The V-berth platform was also raised 8 inches above the waterline.

We are super excited to set up our sewing work area in the coming weeks! We’ve got foam, fabric, and a Sailrite Ultrafeed LSZ-1! Let the sewing lessons begin! We’ll see how things turn out…

Deck Joint

Our deck joint leaked in multiple areas because of bond failure and separation. We fiberglassed the entire joint with 3 layers of 10oz FG tape, and increased thru bolt centers to a minimum of 6 in centers with 1/4 x 20 screws.

Boat Bottom Repair and Paint

This job included gel coat peel, a fiberglass cap along the entire keel, filling thru-hulls, and barrier coat.